Skip to main navigation Skip to search Skip to main content

A Feasibility Study into the Expansion of the Hydrogen Storage at Entrance

Research output: Contribution to conference › Paper › Academic

6 Downloads (Pure)

Abstract

With more emerging technologies for hydrogen storage, it has become more important than ever to properly evaluate different options to ensure technical feasibility and legal compliance. In this study the technical aspects and legal requirements of two main storage technologies: underground gas cylinders and metal hydride have been researched for installation at the Energy Transition Centre in Groningen.
The technical strengths, weaknesses and suitability of the technologies are explored and quantified using engineering calculations, then verified by experts at Entrance. Both technologies operate based on different principles, both offering improvements in safety but each focusing on various other characteristics of hydrogen storage as their main selling point. In terms of legal compliance, the current legal framework for hydrogen storage under the Environment and Planning Act (2024) is insufficient. This is especially the case for people who initiate hydrogen projects and local authorities who need to assess and decide whether the required Environmental and Planning permits can be granted in accordance with the current legal framework. It is however uncertain how the legal framework for hydrogen storage needs to be applied and which interests should be considered in in the decision-making process based on the new criterion: balanced allocation of functions to locations (ETFAL) and the instruction rules concerning safety from the national government. It was found that underground gas cylinders offer a more standard and practical approach at the cost of a more labour- intensive instalment period due to the need for ground excavation, whereas the metal hydride approach is more complex and less efficient, favouring volumetric energy density over gravimetric energy density. However, the less standard technology provides more areas for study at Entrance compared to underground cylinders. The expected results on the legal front reveal that in most cases a Planning permit is required for deviating from the Environmental plan from the local
authority. This is the case since not many Environmental plans provide an assessment framework for hydrogen storage. An Environmental permit is only needed when a large amount of hydrogen is stored.
Whether these permits will be granted depends on the specific facts and circumstances of the initiative, if there remains a balanced allocation of functions to locations (ETFAL) and whether the initiative is in line with the instruction rules concerning safety from the national government.
Original languageEnglish
Pages300-305
Number of pages6
Publication statusPublished - 17 Jun 2026
EventNew Energy Forum: Breaking Barriers - Groningen, Entrance, Groningen, Netherlands
Duration: 17 Jun 2026 → 18 Jun 2026
https://www.newenergyforum.nl/event/home

Conference

ConferenceNew Energy Forum
Country/TerritoryNetherlands
CityGroningen
Period17/06/26 → 18/06/26
Internet address

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 07 - Affordable and Clean Energy
    SDG 07 Affordable and Clean Energy
  2. SDG 09 - Industry, Innovation, and Infrastructure
    SDG 09 Industry, Innovation, and Infrastructure

Keywords

  • hydrogen storage
  • technical and legal feasibility
  • underground gas cylinders

Research Focus Areas Hanze University of Applied Sciences * (mandatory by Hanze)

  • Energy

Research Focus Areas Research Centre or Centre of Expertise * (mandatory by Hanze)

  • Renewable fuels and sustainable gases

Publinova themes

  • Technology

Fingerprint

Dive into the research topics of 'A Feasibility Study into the Expansion of the Hydrogen Storage at Entrance'. Together they form a unique fingerprint.

Cite this